Project 1 of 10

Atelier still life

Context

A personal study in light, material, and negative space—built as a neutral stage for artwork and a signature moment for this site. The goal was gallery-quiet, not flashy 3D.

Impact

Became the visual spine of the portfolio: reusable scene, fast loads, and a calm frame that keeps focus on project stories.

Role
3D, art direction
Year
2026
Month
March
Team
1
Stack
  • Blender
  • Figma

Project 2 of 10

Nordstrand & Co. digital

Context

A regional architecture studio needed a site that felt tactile and editorial without drowning in portfolio grids. Partners and prospective clients were the primary audience.

Impact

Inquiry quality improved: longer briefs, fewer generic contacts, and the team retired a maintenance-heavy Squarespace setup.

Role
Lead design, front-end
Year
2025
Month
September
Team
4
Stack
  • Figma
  • HTML
  • CSS
  • Sanity

Project 3 of 10

Lumina banking

Context

Mobile-first redesign for everyday banking: pay, save, and dispute flows were fragmented and failed accessibility review. Worked with product and compliance from discovery onward.

Impact

Task success in usability tests rose sharply; WCAG contrast issues on money movement flows dropped to zero before rollout.

Role
Product design
Year
2024
Month
June
Team
12
Stack
  • Figma
  • Principle
  • SwiftUI

Project 4 of 10

Meridian Summit titles

Context

Opening motion for an annual tech conference—tight deadline, strict broadcast safe zones, and a brand that prizes restraint over particle explosions.

Impact

Ran across three days of keynotes and social cutdowns; production picked up the toolkit for lower-thirds without extra design hours.

Role
Motion design
Year
2024
Month
October
Team
3
Stack
  • After Effects
  • Illustrator

Project 5 of 10

Field Studies journal

Context

Small-batch publication for a nonprofit field-research network; each issue had to feel archival but stay cheap to print in runs of five hundred.

Impact

Print partner quoted lower spoilage after grid and bleed cleanup; readership surveys cited layout clarity as a top win.

Role
Editorial design
Year
2023
Month
April
Team
2
Stack
  • InDesign
  • Acrobat

Project 6 of 10

Harbor API hub

Context

Developers could not find auth examples or error codes; support tickets repeated the same five questions. The docs needed structure, search, and tone that matched a growing B2B product.

Impact

Support volume for “getting started” fell after launch; time-to-first-successful-request dropped in analytics dashboards.

Role
UX writing, information arch.
Year
2023
Month
November
Team
5
Stack
  • MDX
  • Next.js
  • Algolia

Project 7 of 10

Solstice retail drop

Context

Seasonal campaign for a footwear label entering two new cities—OOH, retail windows, and paid social had to share one modular story without reshooting per format.

Impact

In-store uplift beat the prior summer pilot; marketing reused crops for six weeks without creative fatigue in brand tracking.

Role
Creative direction
Year
2022
Month
July
Team
8
Stack
  • Photoshop
  • Capture One
  • Figma

Project 8 of 10

Workshop Supply identity

Context

New brand for a maker-focused tool retailer competing with big-box beige. The mark needed to work on stamped metal, stitched tags, and monochrome wayfinding.

Impact

Rolled out across packaging and two store pilots; wholesale partners cited stronger shelf recognition in follow-up interviews.

Role
Brand design
Year
2022
Month
February
Team
3
Stack
  • Illustrator
  • FontLab
  • Figma

Project 9 of 10

Echo Home companion

Context

Companion app for a line of connected thermostats and lights—users were overwhelmed by pairing and automations. Hardware shipped; we could not change industrial design, only software clarity.

Impact

Onboarding completion increased in beta; average time to create a first scene dropped after IA and empty-state work shipped.

Role
UX, UI systems
Year
2021
Month
May
Team
6
Stack
  • Figma
  • React Native

Project 10 of 10

Archive 01 microsite

Context

Temporary online archive for a group show—works had to load fast on poor Wi‑Fi, captions needed curator sign-off, and the timeline was under six weeks door to door.

Impact

Gallery extended the build for a traveling variant; median image decode stayed under target on mid-tier phones in field testing.

Role
Design, development
Year
2021
Month
August
Team
2
Stack
  • Eleventy
  • Sharp
  • Netlify